Installation of Effluent Plant system (Control Panels/Control System, electrical supply and containment, outdoor lighting, air supplies, motors, pumps and valves installed)
Project Details
Phase 1 – to reduce tanker removal of effluent from 150 to 10 (Rough) and save money on transport costs. This was also to meet Environmental Standards allowing Unilever to dispose of the water safely down the drain.
Phase 2 – to reuse clean water from the effluent process within the factory eliminating any waste water.